Lexus ES: Generator
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
INSPECTION PROCEDURE 1. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY (a) Using a vernier caliper, measure the length of the exposed brushes. Standard Exposed Brush Length: 9.5 to 11.5 mm (0.374 to 0.45
SEE MORE:
DESCRIPTION Refer to the description for DTC P0ABF11. Click here DTC No. Detection Item DTC Detection Condition Trouble Area MIL Warning Indicate P1C9F11 Hybrid/EV Battery Current Sensor for Driving Control Circuit Short to Ground "Hybrid/EV Battery Current for Driving Control
DESCRIPTION The No. 1 stereo jack adapter assembly sends the sound data signal or image data signal from a USB device to the radio receiver assembly via this circuit. WIRING DIAGRAM PROCEDURE 1. CHECK HARNESS AND CONNECTOR (RADIO RECEIVER ASSEMBLY - NO. 1 STEREO JACK ADAPTER ASSEMBLY) (a)
© 2016-2026 Copyright www.lexguide.net
