Lexus ES: Generator
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
INSPECTION PROCEDURE 1. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY (a) Using a vernier caliper, measure the length of the exposed brushes. Standard Exposed Brush Length: 9.5 to 11.5 mm (0.374 to 0.45
SEE MORE:
DESCRIPTION Detection Item Symptom Trouble Area Skid Control ECU Communication Stop Mode Any of the following conditions are met:
Communication stop for "Skid Control (ABS/VSC/TRAC)" is indicated on the "Communication Bus Check" screen of the Techstream.
Click here
Communication
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during amplifier antenna assembly removal/installation are shown below. Necessary Procedure After Parts Remove
© 2016-2025 Copyright www.lexguide.net
