Lexus ES: Installation
INSTALLATION
PROCEDURE
1. INSTALL GENERATOR ASSEMBLY
(a) Install the generator assembly with the bolt and 2 nuts.
Torque:
25 N·m {255 kgf·cm, 18 ft·lbf}
(b) Engage the clamp.
(c) Connect the E.F.I. vacuum sensor assembly (manifold absolute pressure sensor) connector.
(d) Install the wire harness clamp bracket to the generator assembly with the bolt.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
(e) Connect the wire harness to terminal B with the nut.
Torque:
9.8 N·m {100 kgf·cm, 87 in·lbf}
(f) Close the terminal cap.
(g) Connect the generator assembly connector.
2. INSTALL V-RIBBED BELT
Click here
3. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
4. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Click here
READ NEXT:
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
INSPECTION PROCEDURE 1. INSPECT GENERATOR BRUSH HOLDER ASSEMBLY (a) Using a vernier caliper, measure the length of the exposed brushes. Standard Exposed Brush Length: 9.5 to 11.5 mm (0.374 to 0.45
DISASSEMBLY PROCEDURE 1. REMOVE GENERATOR PULLEY CAP (a) Remove the generator pulley cap from the generator pulley with clutch. NOTICE:
Do not reuse the generator pulley cap.
If the generato
SEE MORE:
CAUTION / NOTICE / HINT HINT: *: Use the Techstream. PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP
NEXT 2. CUSTOMER PROBLEM ANALYSIS
NEXT 3. CONNECT TECHSTREAM TO DLC3* HINT: If the display indicates a communication malfunction, inspect the DLC
DESCRIPTION These DTCs are stored if there is a malfunction in the CAN communication system connected to the rear television camera assembly. HINT: If CAN communication system DTCs are stored, they may also be stored in other systems. DTC No. Detection Item DTC Detection Condition Trouble A
© 2016-2026 Copyright www.lexguide.net
