Lexus ES: A25a-fks (battery / Charging)
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
SEE MORE:
DESCRIPTION The linear solenoids SLA and SLR control the regulator based on signals from the skid control ECU (brake booster with master cylinder assembly) and produce servo pressure in accordance with the vehicle condition. When the system is normal, the switching solenoid SGH is opened to allow br
DISCHARGING PROCEDURE 1. DISCHARGING (WHEN USING THE LI-ION BATTERY DISCHARGER) CAUTION: Be sure to wear insulated gloves and protective goggles. NOTICE: Make sure to observe the following points when using the Li-ion battery discharger.
Set it in a secure, flat place.
Set it in a dry place pro
© 2016-2026 Copyright www.lexguide.net
