Lexus ES: A25a-fks (battery / Charging)
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I
REASSEMBLY PROCEDURE 1. INSTALL GENERATOR ROTOR BEARING (a) Using SST and a press, install a new generator rotor bearing. SST: 09950-60011 09951-00470 SST: 09950-70010 09951-07100 (b
SEE MORE:
PROBLEM SYMPTOMS TABLE NOTICE:
The following inspection procedure of the panoramic view monitor system is described on the assumption that the audio and visual system*1 or navigation system*2 is normal. If the audio and visual system*1 or navigation system*2 has any malfunction, first proceed wit
DTC CHECK / CLEAR CHECK DTC (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Enter the following menus: Body Electrical / (desired system) / Trouble Codes. Body Electrical > Master Switch > Trouble Codes Body Electrical > D-Door Moto
© 2016-2024 Copyright www.lexguide.net