Lexus ES manuals

Lexus ES: Installation

INSTALLATION

PROCEDURE

1. INSTALL NO. 2 HV SUPPLY STACK SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.

(a) Install the No. 2 HV supply stack sub-assembly with the 4 nuts.

Torque:

7.5 N·m {76 kgf·cm, 66 in·lbf}

(b) Engage the claw.

(c) Engage the clamp.

(d) Install the nut to connect the earth terminal.

Torque:

7.5 N·m {76 kgf·cm, 66 in·lbf}

2. INSTALL NO. 1 HV SUPPLY STACK SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.

(a) Install the No. 1 HV supply stack sub-assembly with the 4 nuts.

Torque:

7.5 N·m {76 kgf·cm, 66 in·lbf}

(b) Engage the claw.

(c) Connect the connector.

NOTICE:

Make sure that the connector is connected securely.

(d) Connect the connector.

NOTICE:

Make sure that the connector is connected securely.

3. INSTALL BATTERY ECU ASSEMBLY

Click here

4. INSTALL NO. 1 HV BATTERY INTAKE DUCT LH

CAUTION:

Be sure to wear insulated gloves and protective goggles.

(a) Install the No. 1 hybrid battery intake duct LH to the HV battery with the clip.

(b) Engage the claw of hybrid battery thermistor (sensor portion) to connect the No. 1 hybrid battery intake duct LH.

5. INSTALL NO. 2 HYBRID BATTERY SHIELD SUB-ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.

(a) Install the No. 2 hybrid battery shield sub-assembly to the HV battery with the bolt and 3 nuts.

Torque:

7.5 N·m {76 kgf·cm, 66 in·lbf}

6. INSTALL HYBRID BATTERY TERMINAL BLOCK

Click here

7. INSTALL HV BATTERY JUNCTION BLOCK ASSEMBLY

Click here

8. INSTALL NO. 1 HV BATTERY HOSE

Click here

9. INSTALL UPPER HV BATTERY COVER SUB-ASSEMBLY

Click here

10. INSTALL HV BATTERY

Click here

11. PERFORM INITIALIZATION

Click here

READ NEXT:

 Recovery Inspection

CAUTION / NOTICE / HINT CAUTION: When disposing of an HV supply stack sub-assembly, make sure to return it through an authorized collection agent who is capable of handling it safely. If it is retu

 Discharging

DISCHARGING PROCEDURE 1. DISCHARGING (WHEN USING THE LI-ION BATTERY DISCHARGER) CAUTION: Be sure to wear insulated gloves and protective goggles. NOTICE: Make sure to observe the following points whe

 Hv Battery Thermistor

SEE MORE:

 Initialization

INITIALIZATION INITIALIZE POWER WINDOW CONTROL SYSTEM (ALL DOORS) NOTICE: When any of the door window regulator sub-assemblies, power window regulator motor assemblies, door glass or door glass runs have been removed and reinstalled, the power window control system must be initialized. Functions

 ENG / EHV Device (C1A40)

DESCRIPTION When a SFI system malfunction signal sent by the ECM is detected by the clearance warning ECU assembly, DTC C1A40 is stored. DTC No. Detection Item DTC Detection Condition Trouble Area C1A40 ENG / EHV Device When the engine switch on (IG), a SFI system malfunction signal

© 2016-2025 Copyright www.lexguide.net