Lexus ES: P710 (hybrid Transmission / Transaxle)
READ NEXT:
COMPONENTS ILLUSTRATION *1 DRIVE MODE SELECT SWITCH (COMBINATION SWITCH ASSEMBLY) *2 INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
INSPECTION PROCEDURE 1. INSPECT DRIVE MODE SELECT SWITCH (COMBINATION SWITCH ASSEMBLY) (a) Inspect the "Normal" mode switch: (1) Measure the resistance according to the value(s) in the table below.
SEE MORE:
DESCRIPTION When the power switch is turned to on (IG), the auxiliary battery voltage is applied to IGSW of the ECM. When the transistor in the MREL circuit operates, current flows from the auxiliary battery to ground through the drive circuit of the EFI-MAIN NO. 1 relay, thus operating the relay wh
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during absorber control ECU removal/installation are shown below. Necessary Procedures After Parts Removed/Inst
© 2016-2025 Copyright www.lexguide.net
