Lexus ES: Inspection
INSPECTION
PROCEDURE
1. INSPECT HYBRID BATTERY TERMINAL BLOCK
(a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection | Condition | Specified Condition | Hybrid Battery Terminal Block | Always | Below 1 Ω | If the result is not as specified, replace the hybrid battery terminal block. | |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL HYBRID BATTERY TERMINAL BLOCK CAUTION: Be sure to wear insulated gloves and protective goggles. (a) Connect the 2 hybrid battery terminal block connectors. NOTICE: Ma
COMPONENTS ILLUSTRATION *1 BATTERY SERVICE HOLE COVER *2 SERVICE PLUG GRIP ILLUSTRATION *1 CONNECTOR COVER ASSEMBLY *2 ENGINE ROOM MAIN WIRE Tightening torque for "Major
SEE MORE:
MONITOR DESCRIPTION A monitor will run when the engine is started at an engine coolant temperature of -10 (14°F) or higher, and less than 50°C (122°F). If certain conditions are met, a DTC will be stored after the engine idles for 15 seconds (2 trip detection logic). This DTC is designed to monit
INSTALLATION PROCEDURE 1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY (a) Temporarily install the park/neutral position switch assembly to the automatic transaxle case sub-assembly with the 2 bolts. NOTICE: Before installing the park/neutral position switch assembly, remove any dirt or rust on the
© 2016-2024 Copyright www.lexguide.net
![](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAEALAAAAAABAAEAAAIBTAA7)