Lexus ES: Fuse Box (for Lithium-ion Battery)
READ NEXT:
COMPONENTS ILLUSTRATION *1 BATTERY SERVICE HOLE COVER *2 SERVICE PLUG GRIP ILLUSTRATION *1 CONNECTOR COVER ASSEMBLY *2 ENGINE ROOM MAIN WIRE Tightening torque for "Major
INSPECTION PROCEDURE 1. INSPECT HYBRID BATTERY TERMINAL BLOCK (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Speci
INSTALLATION PROCEDURE 1. INSTALL HYBRID BATTERY TERMINAL BLOCK CAUTION: Be sure to wear insulated gloves and protective goggles. (a) Engage the claw to install the hybrid battery terminal block to th
SEE MORE:
ADJUSTMENT CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during park/neutral position switch assembly removal/installation are shown below. Necessary Procedures Afte
COMPONENTS ILLUSTRATION *1 V-BANK COVER SUB-ASSEMBLY *2 AIR FUEL RATIO SENSOR (for Bank 1) *3 AIR FUEL RATIO SENSOR (for Bank 2) - - N*m (kgf*cm, ft.*lbf): Specified torque * For use with SST
© 2016-2026 Copyright www.lexguide.net
