Lexus ES manuals

Lexus ES: Basic Inspection

DESCRIPTION

When replacing the No. 1 HV supply stack sub-assembly or No. 2 HV supply stack sub-assembly, it is necessary to check, adjust and equalize the SOC of the HV battery. Otherwise, the engine may run longer than normal, resulting in a decrease in fuel efficiency.

PROCEDURE

1.

READ VALUE USING TECHSTREAM (Hybrid Battery SOC)

(a) Connect the Techstream to the DLC3.

(b) Turn the power switch on (IG).

(c) Turn the Techstream on.

(d) Enter the following menus: Powertrain / HV Battery / Data List / Hybrid Battery SOC.

(e) Read the Data List.

Powertrain > HV Battery > Data List

Tester Display

Hybrid Battery SOC

Result

Proceed to

"Hybrid Battery SOC" is 55 to 65%

A

Other than above

B

(f) Turn the power switch off.

A

GO TO STEP 3

B

2.

ADJUST HV BATTERY SOC

HINT:

If the following procedure (charging or discharging of the HV battery) cannot be performed due to the condition of the vehicle, proceed to the next step.

(a) Apply the parking brake and chock all 4 wheels.

(b) Connect the Techstream to the DLC3.

(c) Turn the power switch on (IG).

(d) Turn the Techstream on.

(e) Enter the following menus: Powertrain / HV Battery / Data List / Hybrid Battery SOC.

(f) Depress the accelerator pedal and brake pedal simultaneously or leave the vehicle with neutral (N) selected until the value of Data List item "Hybrid Battery SOC" is between 55% and 65%.

Powertrain > HV Battery > Data List

Tester Display

Hybrid Battery SOC

HINT:

  • Depressing the accelerator pedal and brake pedal simultaneously will cause the HV battery to charge and the value of "Hybrid Battery SOC" to increase.
  • Leaving the vehicle with neutral (N) selected will cause the HV battery to discharge and the value of "Hybrid Battery SOC" to decrease.

(g) Turn the power switch off.

NEXT

3.

REPLACE HV BATTERY (NO. 1 HV SUPPLY STACK SUB-ASSEMBLY or NO. 2 HV SUPPLY STACK SUB-ASSEMBLY)

Click here

NEXT

4.

ROAD TEST

(a) Turn the power switch on (READY).

(b) Drive the vehicle on urban roads for approximately 10 minutes.

HINT:

Perform this procedure in order to ensure the accuracy of the inspection in the next step.

(c) Turn the power switch off.

NEXT

5.

READ VALUE USING TECHSTREAM (Delta SOC)

(a) Connect the Techstream to the DLC3.

(b) Turn the power switch on (IG).

(c) Turn the Techstream on.

(d) Enter the following menus: Powertrain / HV Battery / Data List / Delta SOC.

(e) Check and Record the Data List.

Powertrain > HV Battery > Data List

Tester Display

Delta SOC

Result

Proceed to

"Delta SOC" is 0 to 5%

A

Other than above

B

(f) Turn the power switch off.

A

END

B

6.

TIME TO EQUALIZE SOC

(a) According to the value of Data List item "Delta SOC" recorded in the previous step, equalize the SOC.

"Delta SOC"

Time to Equalize SOC

(Total time necessary to leave power switch off)

6 to 10%

29 hours

11 to 15%

49 hours

16 to 20%

66 hours

21 to 25%

85 hours

26 to 30%

103 hours

HINT:

  • SOC equalization is performed when the power switch is off.
  • It is not necessary to leave the power switch off continuously for the time shown in the table. The time shown is the cumulative time the power switch must be off after a HV supply stack sub-assembly has been replaced for SOC equalization to complete.
NEXT

END

READ NEXT:

 Inspection

INSPECTION PROCEDURE 1. INSPECT HV SUPPLY STACK SUB-ASSEMBLY CAUTION: Be sure to wear insulated gloves and protective goggles. (a) Remove the HV supply stack sub-assembly. Click here (b) Inspect th

 Installation

INSTALLATION PROCEDURE 1. INSTALL NO. 2 HV SUPPLY STACK SUB-ASSEMBLY CAUTION: Be sure to wear insulated gloves and protective goggles. (a) Install the No. 2 HV supply stack sub-assembly with the 4 nut

 Recovery Inspection

CAUTION / NOTICE / HINT CAUTION: When disposing of an HV supply stack sub-assembly, make sure to return it through an authorized collection agent who is capable of handling it safely. If it is retu

SEE MORE:

 Sliding Roof Switch Assembly

ComponentsCOMPONENTS ILLUSTRATION *1 MAP LIGHT ASSEMBLY *2 MAP LIGHT SUB-ASSEMBLY *3 ROOF CONSOLE BOX INNER COVER - - ● Non-reusable part - - InspectionINSPECTION PROCEDURE 1. INSPECT MAP LIGHT SUB-ASSEMBLY (PANORAMIC MOON ROOF SWITCH) (for Panoramic Moon Roof)

 Data List / Active Test

DATA LIST / ACTIVE TEST DATA LIST NOTICE: Some Data List values may vary significantly if there are slight differences in the environment in which the vehicle is operating when measurements are obtained. Variations may also occur due to aging of the vehicle. Due to these considerations, it is not

© 2016-2024 Copyright www.lexguide.net