Lexus ES: System Diagram
SYSTEM DIAGRAM

READ NEXT:
DATA LIST / ACTIVE TEST ACTIVE TEST HINT: Using the Techstream to perform Active Tests allows relays, VSVs, actuators and other items to be operated without removing any parts. This non-intrusive func
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT HORN RELAY *a Component without harness connected (HORN Relay) (a) Measure the resistance according to the value(s) in the tab
SEE MORE:
INSTALLATION CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE 1. INSTALL REAR SUSPENSION ARM BRACKET (a) Temporarily install the rear suspension arm bracket to the rear trailing arm assembly with the bo
DESCRIPTION When the front doors are closed, each power window regulator motor assembly can be operated for approximately 45 seconds after the power switch is turned from on (IG) to off by receiving operation permission signals from the main body ECU (multiplex network body ECU). However, when appro
© 2016-2026 Copyright www.lexguide.net
