Lexus ES: Precaution
PRECAUTION
HINT:
-
Any digits beyond the 0.01 mm (1/1000 in.) place for standard, minimum and maximum values should be used as a reference only.
-
When both standard and maximum or minimum values are listed for an inspection, use the standard value as a reference only and base any judgments on the maximum and minimum values.
READ NEXT:
COMPONENTS ILLUSTRATION *1 INTAKE VALVE *2 INTAKE VALVE GUIDE BUSH *3 COMPRESSION SPRING *4 EXHAUST VALVE *5 EXHAUST VALVE GUIDE BUSH *6 STUD BOLT *7 SPARK PLUG TUB
INSPECTION PROCEDURE 1. INSPECT CYLINDER HEAD SUB-ASSEMBLY (a) Using a precision straightedge and feeler gauge, measure the warpage of the contact surfaces where the cylinder head sub-assembly contact
REPLACEMENT PROCEDURE 1. REPLACE INTAKE VALVE GUIDE BUSH (a) Heat the cylinder head sub-assembly to between 80 and 100°C (176 and 212°F). (b) Place the cylinder head sub-assembly on wooden blocks. C
SEE MORE:
TERMINALS OF ECM ECM HINT: The standard voltage and resistance of each ECM terminal is shown in the table below. In the table, first follow the information under "Condition". Look under "Terminal No. (Symbol)" for the terminals to be inspected. The standard voltage or resistance between the termina
REMOVAL CAUTION / NOTICE / HINT HINT:
Use the same procedure for the RH side and LH side.
The following procedure is for the LH side.
PROCEDURE 1. REMOVE NO. 2 ROCKER PANEL MOULDING PROTECTOR Click here 2. REMOVE ROCKER PANEL MOULDING COVER (a) Using a screwdriver with its tip wrapped w
© 2016-2025 Copyright www.lexguide.net
