Lexus ES: Oil Pressure Switching Valve
READ NEXT:
COMPONENTS ILLUSTRATION *1 FRONT FENDER APRON SEAL RH *2 OIL PRESSURE CONTROL VALVE ASSEMBLY N*m (kgf*cm, ft.*lbf): Specified torque - -
REMOVAL CAUTION / NOTICE / HINT NOTICE: This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here PROCEDURE
INSPECTION PROCEDURE 1. INSPECT OIL PRESSURE CONTROL VALVE ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition
SEE MORE:
PRECAUTION PRECAUTION FOR DISCONNECTING CABLE FROM NEGATIVE BATTERY TERMINAL NOTICE: When disconnecting the cable from the negative (-) battery terminal, initialize the following systems after the cable is reconnected. System Name See Procedure Lane Control System (for Gasoline Model)
INSTALLATION PROCEDURE 1. INSTALL REAR ENGINE MOUNTING INSULATOR (a) Engage the clamp and install the vacuum hose to the rear engine mounting insulator. (b) Install the wire harness clamp bracket to the rear engine mounting insulator with the bolt. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} (c) Al
© 2016-2026 Copyright www.lexguide.net
