Lexus ES: Hood
READ NEXT:
COMPONENTS ILLUSTRATION *A for TMK Made *B for TMMK Made *1 HOOD CUSHION CENTER *2 HOOD INSULATOR *3 WASHER HOSE ASSEMBLY *4 WASHER NOZZLE SUB-ASSEMBLY *5 HOOD INSU
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT HOOD SUB-ASSEMBLY (a) Check that the clearance measurements of areas a through d are within each standard range. Standard Clearance Area Measurement
DISASSEMBLY PROCEDURE 1. REMOVE HOOD CUSHION CENTER (a) Using a clip remover, disengage the 10 hood to cowl top seal clips to remove the hood cushion center. (b) Remove the 10 hood to c
SEE MORE:
ComponentsCOMPONENTS ILLUSTRATION *1 CAMSHAFT TIMING VALVE ASSEMBLY - - N*m (kgf*cm, ft.*lbf): Specified torque - - On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. REMOVE CAM TIMING OIL CONTROL SOLENOID ASSEMBLY Click here 2. INSPECT CAMSHAFT TIMING VALVE ASSEMBLY
DESCRIPTION The tire pressure warning valve and transmitters that are installed in the tire and wheel assemblies measure the tire pressure of each wheel. The measured values are transmitted to the tire pressure warning ECU and receiver in the vehicle as radio waves. The ECU compares the measured tir
© 2016-2025 Copyright www.lexguide.net
