Lexus ES manuals

Lexus ES: Components

COMPONENTS

ILLUSTRATION

*1

FRONT FENDER APRON SEAL RH

*2

V-BANK COVER SUB-ASSEMBLY

N*m (kgf*cm, ft.*lbf): Specified torque

-

-

ILLUSTRATION

*1

CAMSHAFT TIMING GEAR BOLT

*2

O-RING

*3

CAMSHAFT TIMING OIL CONTROL SOLENOID ASSEMBLY (for Intake Side of Bank 1)

-

-

N*m (kgf*cm, ft.*lbf): Specified torque

Non-reusable part

Adhesive 1324

Precoated part

READ NEXT:

 Removal

REMOVAL PROCEDURE 1. REMOVE FRONT WHEEL RH Click here 2. REMOVE FRONT FENDER APRON SEAL RH Click here 3. REMOVE V-BANK COVER SUB-ASSEMBLY Click here 4. REMOVE CAMSHAFT TIMING OIL CONTROL SOL

 Inspection

INSPECTION PROCEDURE 1. INSPECT CAMSHAFT TIMING GEAR BOLT (a) Check the stroke of the plunger in the center of the camshaft timing gear bolt. Standard Stroke: 4.5 mm (0.177 in.) or more HINT: When

 Installation

INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT (a) Make sure that the No. 1 cylinder is at TDC/compression. HINT: Check that the cutout of the camshaft timing gear assembly is at the top

SEE MORE:

 Adjustment

ADJUSTMENT PROCEDURE 1. SECURE VEHICLE (a) Fully apply the parking brake and chock a wheel. CAUTION: Make sure to apply the parking brake and chock a wheel before performing this procedure. If the vehicle is not secure and the shift lever is moved to N, the vehicle may suddenly move, possibly r

 Certification ECU Communication Stop Mode

DESCRIPTION Detection Item Symptom Trouble Area Certification ECU Communication Stop Mode Any of the following conditions are met: Communication stop for "Certification (Smart)" is indicated on the "Communication Bus Check" screen of the Techstream. Click here Communication sto

© 2016-2026 Copyright www.lexguide.net