Lexus ES manuals

Lexus ES: Installation

INSTALLATION

PROCEDURE

1. INSTALL ELECTRIC VEHICLE BATTERY PLUG ASSEMBLY

CAUTION:

Be sure to wear insulated gloves and protective goggles.

(a) Install the electric vehicle battery plug assembly to the HV battery with the bolt.

Torque:

7.5 N·m {76 kgf·cm, 66 in·lbf}

(b) Connect the hybrid battery terminal block connector.

NOTICE:

Make sure that the connector is connected securely.

(c) Connect the HV battery junction block assembly connector.

NOTICE:

Make sure that the connector is connected securely.

(d) Engage the 2 claws to close the wiring harness protector.

(e) Connect the electric vehicle battery plug assembly connector.

2. INSTALL NO. 1 HV BATTERY COVER PANEL RH

Click here

3. INSTALL REAR SEAT CUSHION LEG SUB-ASSEMBLY

Click here

4. INSTALL REAR UNDER COVER

Click here

5. INSTALL REAR UNDER SIDE COVER LH

Click here

6. INSTALL REAR DOOR SCUFF PLATE LH

Click here

7. INSTALL REAR UNDER SIDE COVER RH

Click here

8. INSTALL REAR DOOR SCUFF PLATE RH

HINT:

Use the same procedure as for the LH side.

9. INSTALL REAR SEAT CUSHION LOCK HOOK

Click here

10. INSTALL REAR SEAT CUSHION ASSEMBLY

Click here

11. INSTALL SERVICE PLUG GRIP

Click here

READ NEXT:

 Battery Voltage Sensor

 Components

COMPONENTS ILLUSTRATION *1 UPPER HV BATTERY COVER SUB-ASSEMBLY *2 BATTERY VOLTAGE SENSOR *3 NO. 1 HV BATTERY SHIELD PANEL - - N*m (kgf*cm, ft.*lbf): Specified torque - -

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during batt

SEE MORE:

 Terminals Of Ecu

TERMINALS OF ECU STEREO COMPONENT EQUALIZER ASSEMBLY Terminal No. (Symbol) Wiring Color Terminal Description Condition Specified Condition G15-1 (CANH) P CAN communication signal - - G15-2 (ACK1) V Serial communication (UART) signal - - G15-3 (NEI) - G15-28 (G

 Terminals Of Ecu

TERMINALS OF ECU NOTICE: DTCs may be output when connectors are disconnected during inspection. Therefore, be sure to clear the DTCs using the Techstream once the inspection has been completed. Do not apply excessive force to the forward recognition camera connector. CHECK FORWARD RECOGNITI

© 2016-2026 Copyright www.lexguide.net