Lexus ES manuals

Lexus ES: Installation

INSTALLATION

PROCEDURE

1. INSTALL FUEL MAIN VALVE ASSEMBLY

(a) Apply gasoline to 2 new O-rings. Then install the O-rings to the fuel main valve assembly (for Low Pressure).

(b) Apply gasoline to 2 new O-rings. Then install the O-rings to the fuel main valve assembly (for High Pressure).

(c) Install the 2 fuel main valve assemblies to the fuel filter.

*1

Fuel Main Valve Assembly (for Low Pressure)

*2

Fuel Main Valve Assembly (for High Pressure)

*a

Identification Mark (Part Number)

-

-

NOTICE:

  • Make sure that the O-rings are not cut or pinched during installation.
  • The fuel main valve assembly (for Low Pressure) and fuel main valve assembly (for High Pressure) have identification marks (part numbers). If the parts are installed in the incorrect positions, the engine may stall. Therefore, make sure to install the parts in the correct positions.

A

Fuel Main Valve Assembly (for Low Pressure)

23070-31***

B

Fuel Main Valve Assembly (for High Pressure)

23070-36***

(d) Install the 2 clips to the fuel filter.

2. INSTALL FUEL PUMP WITH FILTER ASSEMBLY

Click here

3. INSTALL FUEL SUCTION TUBE WITH PUMP AND GAUGE ASSEMBLY

Click here

READ NEXT:

 Fuel Pressure Sensor

 Components

COMPONENTS ILLUSTRATION *1 FUEL PRESSURE SENSOR (FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY) - -

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel

SEE MORE:

 On-vehicle Inspection

ON-VEHICLE INSPECTION PROCEDURE 1. CHECK FUEL PUMP WITH FILTER ASSEMBLY OPERATION AND INSPECT FOR FUEL LEAK (a) Check fuel pump operation. (1) Connect the Techstream to the DLC3. (2) Turn the engine switch on (IG). NOTICE: Do not start the engine. (3) Turn the Techstream on. (4) Enter the following

 Hybrid/EV Battery Cooling Fan 1 Circuit Short to Ground (P0A8111,P0A814B)

DESCRIPTION The battery cooling blower assembly speed is controlled by the hybrid vehicle control ECU. Power is supplied to the battery cooling blower assembly when the MREL terminal of the hybrid vehicle control ECU turns on the IGCT relay. The hybrid vehicle control ECU sends command signals (SI0)

© 2016-2026 Copyright www.lexguide.net