Lexus ES: Installation
INSTALLATION
PROCEDURE
1. INSTALL MOTOR CABLE
CAUTION:
Be sure to wear insulated gloves.
(a) Using an insulated tool, install the motor cable to the hybrid vehicle transaxle assembly with the 6 bolts.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
NOTICE:
-
Keep the motor cable terminals and their installation area free from foreign matter, water, etc.
-
Do not touch the waterproof seal or terminals of the motor cable.
(b) Engage the 2 claws to install a new terminal cap to the hybrid vehicle transaxle assembly.
NOTICE:
-
Keep the terminal cap and its installation area free from foreign matter, water, etc.
-
Do not pinch the O-ring.
-
Check that the terminal cap is securely installed.
(c) Temporarily install the connector cover to the hybrid vehicle transaxle assembly with the 2 bolts.
(d) Tighten the 2 bolts to install the connector cover.
Torque:
10 N·m {102 kgf·cm, 7 ft·lbf}
2. INSTALL INVERTER WITH CONVERTER ASSEMBLY
Click here
READ NEXT:
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during mot
COMPONENTS ILLUSTRATION *1 FRONT WHEEL OPENING EXTENSION PAD RH *2 FRONT WHEEL OPENING EXTENSION PAD LH *3 NO. 1 ENGINE UNDER COVER *4 NO. 2 ENGINE UNDER COVER ASSEMBLY *5 FR
SEE MORE:
TERMINALS OF ECU CHECK AIR CONDITIONING AMPLIFIER ASSEMBLY *A w/o Seat Heater *B w/ Seat Heater (a) Disconnect the G39 air conditioning amplifier assembly connector. (b) Measure the voltage and resistance according to the value(s) in the table below. HINT: Measure the values on the wire
DESCRIPTION The headlight ECU sub-assembly LH and headlight ECU sub-assembly RH internally boost the power supply voltage to ensure a constant supplied current for the lo/hi beam LED of their respective headlight. By monitoring the LED power supply voltage, abnormal current and malfunctions can be d
© 2016-2024 Copyright www.lexguide.net