Lexus ES: Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
| Tester Connection | Condition | Specified Condition |
| 1 - 2 | 20°C (68°F) | 22 to 28 Ω |
If the result is not as specified, replace the flow shutting valve (No. 1 water by-pass hose).
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (NO. 1 WATER BY-PASS HOSE) (a) Install the flow shutting valve (No. 1 water by-pass hose) with the bolt. Torque: 19 N·m {194 kgf·cm, 14 ft·lbf
COMPONENTS ILLUSTRATION *1 FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) *2 VACUUM HOSE *3 ENGINE WIRE HARNESS *4 OUTLET HEATER HOSE *5 INLET HEATER HOSE *6 NO. 2 WAT
SEE MORE:
CUSTOMIZE PARAMETERS CUSTOMIZE POWER WINDOW CONTROL SYSTEM HINT: The following items can be customized. NOTICE:
When the customer requests a change in a function, first make sure that the function can be customized.
Be sure to make a note of the current settings before customizing.
When troub
PROBLEM SYMPTOMS TABLE NOTICE: Before replacing the main body ECU (multiplex network body ECU), refer to Registration. Click here HINT:
Use the table below to help determine the cause of problem symptoms. If multiple suspected areas are listed, the potential causes of the symptoms are listed i
© 2016-2026 Copyright www.lexguide.net
