Lexus ES: Components
COMPONENTS
ILLUSTRATION
| *1 | FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) | *2 | VACUUM HOSE |
| *3 | ENGINE WIRE HARNESS | *4 | OUTLET HEATER HOSE |
| *5 | INLET HEATER HOSE | *6 | NO. 2 WATER BY-PASS PIPE SUB-ASSEMBLY |
| *7 | WATER HOSE CLAMP BRACKET | - | - |
| N*m (kgf*cm, ft.*lbf): Specified torque | - | - |
READ NEXT:
INSPECTION PROCEDURE 1. INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) (a) Connect the flow shutting valve (water by-pass hose assembly) to the transmission oil cooler and slide the clip
SEE MORE:
TERMINALS OF ECU HINT: Check from the rear of the connector while it is connected to the components. RADIO RECEIVER ASSEMBLY Terminal No. (Symbol) Wiring Color Terminal Description Condition Specified Condition G7-1 (FR+) - G6-1 (GND1) W - W-B Sound signal (Right) Audio system
INSTALLATION PROCEDURE 1. INSTALL NO. 2 FUEL TANK CUSHION (a) Install a new No. 2 fuel tank cushion to the fuel tank assembly. 2. INSTALL NO. 3 FUEL TANK CUSHION (a) Install 2 new No. 3 fuel tank cushions to the fuel tank assembly. 3. INSTALL NO. 1 FUEL TANK CUSHION (a) Install a new No. 1 fuel tank
© 2016-2026 Copyright www.lexguide.net
