Lexus ES: Components
COMPONENTS
ILLUSTRATION
| *1 | AUXILIARY BATTERY | *2 | BATTERY HOSE |
| *3 | NEGATIVE AUXILIARY BATTERY TERMINAL | *4 | POSITIVE AUXILIARY BATTERY TERMINAL |
| *5 | NO. 3 BATTERY CLAMP | *6 | TERMINAL CONNECTOR COVER |
| Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf) | | N*m (kgf*cm, ft.*lbf): Specified torque |
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL GENERATOR ASSEMBLY (a) Install the generator assembly with the bolt and 2 nuts. Torque: 25 N·m {255 kgf·cm, 18 ft·lbf} (b) Engage the clamp. (c) Connect the E.F.I
SEE MORE:
REMOVAL
CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization, or registration)
that must be performed after parts are removed and installed, or replaced during
spark plug removal/installation are shown below.
Necessary Procedures After Parts Removed/Instal
ComponentsCOMPONENTS ILLUSTRATION *1 CAMSHAFT TIMING VALVE ASSEMBLY - - N*m (kgf*cm, ft.*lbf): Specified torque - - On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. REMOVE CAM TIMING OIL CONTROL SOLENOID ASSEMBLY Click here 2. INSPECT CAMSHAFT TIMING VALVE ASSEMBLY
© 2016-2025 Copyright www.lexguide.net
