Lexus ES: Components
COMPONENTS
ILLUSTRATION
*A | for EGR Valve Bracket Connection Type | *B | for Cylinder Head Cover Sub-assembly Connection Type |
*1 | FUEL PUMP ASSEMBLY | *2 | NO. 1 FUEL PIPE SUB-ASSEMBLY |
*3 | FUEL TUBE SUB-ASSEMBLY | *4 | FUEL PUMP LIFTER ASSEMBLY |
*5 | FUEL PUMP FLANGE | *6 | FUEL PUMP SPACER GASKET |
*7 | NO. 2 WATER BY-PASS PIPE | *8 | FUEL PIPE CLAMP |
*9 | O-RING | - | - |
| Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf) | | N*m (kgf*cm, ft.*lbf): Specified torque |
* | For use with a union nut wrench | ● | Non-reusable part |
READ NEXT:
ON-VEHICLE INSPECTION PROCEDURE 1. FUEL PUMP ASSEMBLY OPERATION (a) Check fuel pressure. (1) Connect the Techstream to the DLC3. (2) Turn the power switch on (IG). (3) Turn the Techstream on. (4) Put
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel
INSPECTION PROCEDURE 1. INSPECT FUEL PUMP ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condit
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT (a) Make sure that the No. 1 cylinder is at TDC/compression. HINT: Check that the cutout of the camshaft timing gear assembly is at the top and align the timing mark (cutout) of the crankshaft pulley with the timing mark on the timing chain
PRECAUTION PRECAUTIONS FOR INSPECTING HYBRID CONTROL SYSTEM (a) Before the following operations are conducted, take precautions to prevent electric shock by turning the power switch off, wearing insulated gloves, and removing the service plug grip from HV battery.
Inspecting the high-voltage syst
© 2016-2024 Copyright www.lexguide.net