Lexus ES manuals

Lexus ES: Components

COMPONENTS

ILLUSTRATION

*A

for EGR Valve Bracket Connection Type

*B

for Cylinder Head Cover Sub-assembly Connection Type

*1

FUEL PUMP ASSEMBLY

*2

NO. 1 FUEL PIPE SUB-ASSEMBLY

*3

FUEL TUBE SUB-ASSEMBLY

*4

FUEL PUMP LIFTER ASSEMBLY

*5

FUEL PUMP FLANGE

*6

FUEL PUMP SPACER GASKET

*7

NO. 2 WATER BY-PASS PIPE

*8

FUEL PIPE CLAMP

*9

O-RING

-

-

Tightening torque for "Major areas involving basic vehicle performance such as moving/turning/stopping": N*m (kgf*cm, ft.*lbf)

N*m (kgf*cm, ft.*lbf): Specified torque

*

For use with a union nut wrench

Non-reusable part

READ NEXT:

 On-vehicle Inspection

ON-VEHICLE INSPECTION PROCEDURE 1. FUEL PUMP ASSEMBLY OPERATION (a) Check fuel pressure. (1) Connect the Techstream to the DLC3. (2) Turn the power switch on (IG). (3) Turn the Techstream on. (4) Put

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during fuel

 Inspection

INSPECTION PROCEDURE 1. INSPECT FUEL PUMP ASSEMBLY (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Condit

SEE MORE:

 Installation

INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT (a) Make sure that the No. 1 cylinder is at TDC/compression. HINT: Check that the cutout of the camshaft timing gear assembly is at the top and align the timing mark (cutout) of the crankshaft pulley with the timing mark on the timing chain

 Precaution

PRECAUTION PRECAUTIONS FOR INSPECTING HYBRID CONTROL SYSTEM (a) Before the following operations are conducted, take precautions to prevent electric shock by turning the power switch off, wearing insulated gloves, and removing the service plug grip from HV battery. Inspecting the high-voltage syst