Lexus ES: Thermostat
READ NEXT:
COMPONENTS ILLUSTRATION *1 NO. 2 RADIATOR HOSE *2 WATER INLET WITH THERMOSTAT SUB-ASSEMBLY *3 GASKET *4 NO. 7 WATER BY-PASS HOSE N*m (kgf*cm, ft.*lbf): Specified torque â—
REMOVAL CAUTION / NOTICE / HINT NOTICE: This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here PROCEDURE
INSPECTION PROCEDURE 1. INSPECT WATER INLET WITH THERMOSTAT SUB-ASSEMBLY CAUTION:
Do not put your hands into the water that has been heated for the inspection.
Touching the heated water could
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL CAMSHAFT TIMING GEAR BOLT (a) Make sure that the No. 1 cylinder is at TDC/compression. HINT: Check that the cutout of the camshaft timing gear assembly is at the top and align the timing mark (cutout) of the crankshaft pulley with the timing mark on the timing chain
INSTALLATION PROCEDURE 1. INSTALL FUEL PUMP CONTROL ECU BRACKET (a) Install the fuel pump control ECU bracket to the fuel pump control ECU with the 2 bolts. Torque: 4.5 N·m {46 kgf·cm, 40 in·lbf} 2. INSTALL FUEL PUMP CONTROL ECU (a) Install the fuel pump control ECU to the vehicle body with the
© 2016-2026 Copyright www.lexguide.net
