Lexus ES: Removal
REMOVAL
PROCEDURE
1. REMOVE INSTRUMENT PANEL FINISH PANEL END LH
Click here
2. REMOVE INSTRUMENT PANEL FINISH PANEL END RH
Click here
3. REMOVE CENTER INSTRUMENT CLUSTER FINISH PANEL SUB-ASSEMBLY
Click here
4. REMOVE SHIFT LEVER KNOB SUB-ASSEMBLY
for UA80E:
Click here
for P710:
Click here
for UB80F:
Click here
5. REMOVE REAR UPPER CONSOLE PANEL SUB-ASSEMBLY
Click here
6. REMOVE REMOTE OPERATION CONTROLLER ASSEMBLY
(a) Remove the 4 screws and remote operation controller assembly as shown in the illustration.
| Remove in this Direction |
READ NEXT:
ADJUSTMENT PROCEDURE 1. PERFORM BLIND SPOT MONITOR BEAM AXIS CONFIRMATION HINT: The blind spot monitor beam axis confirmation is performed to confirm whether the sensor's beam axis is correct, and per
SEE MORE:
TERMINALS OF ECU CHECK SLIDING ROOF ECU (SLIDING ROOF DRIVE GEAR ASSEMBLY) (a) Disconnect the Q1 sliding roof ECU (sliding roof drive gear assembly) connector. (b) Measure the resistance and voltage according to the value(s) in the table below. HINT: Measure the values on the wire harness side with
CAUTION / NOTICE / HINT HINT:
Use the following procedure to troubleshoot the power mirror control system (w/ Memory).
*: Use the Techstream.
PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP
NEXT 2. CUSTOMER PROBLEM ANALYSIS HINT:
In troubleshooting, confirm tha
© 2016-2026 Copyright www.lexguide.net
