Lexus ES manuals

Lexus ES: On-vehicle Inspection

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT CAM TIMING CONTROL MOTOR WITH EDU ASSEMBLY

(a) Check Rotation Direction Signal:

(1) Connect the Techstream to the DLC3.

(2) Turn the engine switch on (IG).

(3) Turn the Techstream on.

(4) Enter the following menus: Powertrain / Engine / Data List / VVT-iE Motor Direction Bank1.

Powertrain > Engine > Data List

Tester Display

VVT-iE Motor Direction Bank 1

(5) According to the display on the Techstream, read the Data List.

Specified Condition:

Techstream Display

Condition

Specified Condition

VVT-iE Motor Direction Bank1

Engine switch off → Engine switch on (IG)

Backward

HINT:

If the result is not as specified, inspect the cam timing control motor with EDU assembly and wire harness.

(b) Check VVT Change Angle:

(1) Connect the Techstream to the DLC3.

(2) Turn the engine switch on (IG).

(3) Turn the Techstream on.

(4) Start the engine and warm it up until the engine coolant temperature reaches 75°C (167°F) or higher.

(5) Enter the following menus: Powertrain / Engine / Active Test / Control the VVT-iE Opening Angle Bank 1 / Data List / Intake VVT Change Angle Bank 1 and Intake VVT Target Angle Bank 1.

Powertrain > Engine > Active Test

Active Test Display

Control the VVT-iE Opening Angle Bank 1

Data List Display

Intake VVT Change Angle Bank 1

Intake VVT Target Angle Bank 1

(6) Read the Data List while performing the Active Test with the engine idling.

Specified Condition:

Active Test Movement Order

Difference between "Intake VVT Change Angle Bank 1" and "Intake VVT Target Angle Bank 1"

0 deg → 10 deg → 20 deg → 40 deg → 0 deg → 10 deg → END

Within 4 DegFR

HINT:

If the result is not as specified, inspect the cam timing control motor with EDU assembly and camshaft timing gear assembly.

READ NEXT:

 Inspection

INSPECTION CAUTION / NOTICE / HINT NOTICE: Make sure the contact surface of the cam timing control motor with EDU assembly (the surface that contacts the No. 2 timing gear cover assembly) is free o

 Installation

INSTALLATION CAUTION / NOTICE / HINT NOTICE: This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here

 Crankshaft Position Sensor

ComponentsCOMPONENTS ILLUSTRATION *1 CRANKSHAFT POSITION SENSOR *2 O-RING N*m (kgf*cm, ft.*lbf): Specified torque ● Non-reusable part InstallationINSTALLATION CAUTION / NOT

SEE MORE:

 Disassembly

DISASSEMBLY CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH side and LH side. The following procedure is for the LH side. PROCEDURE 1. REMOVE HEADLIGHT ECU SUB-ASSEMBLY Click here 2. REMOVE HEADLIGHT GASKET Click here 3. REMOVE HEADLIGHT RIM (for TMC Made) Click here 4.

 Open in Bus 1 Main Bus Line

DESCRIPTION There may be an open circuit in one of the CAN main bus lines when the resistance between terminals 23 (CA1H) and 8 (CA1L) of the central gateway ECU (network gateway ECU) is 70 Ω or higher. Symptom Trouble Area Resistance between terminals 23 (CA1H) and 8 (CA1L) of the central

© 2016-2024 Copyright www.lexguide.net