Lexus ES: Installation
INSTALLATION
PROCEDURE
1. INSTALL TELEPHONE AND GPS ANTENNA CORD
(a) Engage the 5 clamps to install the telephone and GPS antenna cord.
(b) Connect the connector.
2. INSTALL ROOF HEADLINING ASSEMBLY
Click here
READ NEXT:
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during tel
COMPONENTS ILLUSTRATION *A for Moon Roof - - *1 TELEPHONE AND GPS ANTENNA ASSEMBLY *2 TELEPHONE AND GPS ANTENNA ASSEMBLY WITH COVER *3 COVER *4 WASHER AND HOLDER *5
SEE MORE:
DESCRIPTION When the mirror heater switch (rear window defogger switch) is operated, the mirror heater signal is sent to the air conditioning amplifier assembly and then to each outer mirror control ECU assembly via CAN communication. Based on this signal, the outer mirror control ECU assemblies ope
DESCRIPTION When the CAN bus main lines are normal (no open, short to ground, short to +B or short between lines) and there is an ECU or sensor on the "Communication Bus Check" screen that is indicated as not communicating or whose connection status on the "Communication Bus Check" screen changes in
© 2016-2026 Copyright www.lexguide.net
