1. INSTALL ENGINE COOLANT TEMPERATURE SENSOR
HINT:
Perform "Inspection After Repair" after replacing the engine coolant temperature sensor.
Click here
(a) Apply a light coat of engine coolant to the O-ring of the engine coolant temperature sensor.
(b) Install the engine coolant temperature sensor to the water outlet with a new clip.
NOTICE:
-
If the engine coolant temperature sensor has been struck or dropped, replace it.
-
If reusing the engine coolant temperature sensor, be sure to inspect the O-ring.
-
Make sure that the O-ring is not cracked or moved out of place when installing the engine coolant temperature sensor.
(c) Connect the engine coolant temperature sensor connector.
2. INSTALL INVERTER WITH CONVERTER ASSEMBLY
Click here
3. INSTALL NO. 2 ENGINE COOLANT TEMPERATURE SENSOR
(a) Apply a light coat of engine coolant to the O-ring of the No. 2 engine coolant temperature sensor.
(b) Install the No. 2 engine coolant temperature sensor to the radiator pipe with a new clip.
NOTICE:
-
If the No. 2 engine coolant temperature sensor has been struck or dropped, replace it.
-
If reusing the No. 2 engine coolant temperature sensor, be sure to inspect the O-ring.
-
Make sure that the O-ring is not cracked or moved out of place when installing the No. 2 engine coolant temperature sensor.
(c) Connect the No. 2 engine coolant temperature sensor connector.
4. INSTALL INLET AIR CLEANER ASSEMBLY
Click here
5. INSTALL COOL AIR INTAKE DUCT SEAL
Click here
6. ADD ENGINE COOLANT (for Engine)
Click here
7. INSPECT FOR COOLANT LEAK (for Engine)
Click here
8. PERFORM INITIALIZATION
(a) Perform "Inspection After Repair" after replacing the engine coolant temperature sensor.
Click here
READ NEXT:
COMPONENTS ILLUSTRATION *1 IGNITION COIL ASSEMBLY *2 NO. 1 ENGINE COVER SUB-ASSEMBLY *3 SPARK PLUG - - N*m (kgf*cm, ft.*lbf): Specified torque - -
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during ign
SEE MORE:
ON-VEHICLE INSPECTION PROCEDURE 1. FUEL PUMP ASSEMBLY OPERATION (a) Check fuel pressure. (1) Connect the Techstream to the DLC3. (2) Turn the power switch on (IG). (3) Turn the Techstream on. (4) Put the engine in Inspection Mode (Maintenance Mode). Powertrain > Hybrid Control > Utility Tes
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during rear height control sensor sub-assembly LH removal/installation are shown below. Necessary Procedure Aft
© 2016-2025 Copyright www.lexguide.net