Lexus ES manuals

Lexus ES: Installation

INSTALLATION

PROCEDURE

1. INSTALL WATER INLET WITH THERMOSTAT SUB-ASSEMBLY

(a) Install a new gasket to the water inlet with thermostat sub-assembly.

(b) Install the water inlet with thermostat sub-assembly with the 2 bolts and 2 nuts.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

2. CONNECT WATER BY-PASS HOSE

(a) Connect the water by-pass hose and slide the clip to secure it.

3. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH

Click here

4. CONNECT ENGINE WIRE

(a) Engage the clamp to connect the engine wire.

(b) Install the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(c) Connect the water inlet with thermostat sub-assembly connector.

5. INSTALL NO. 2 ENGINE MOUNTING STAY RH

(a) Install the No. 2 engine mounting stay RH to the intake manifold and front No. 1 engine mounting bracket LH with the bolt.

Torque:

21 N·m {214 kgf·cm, 15 ft·lbf}

(b) Connect the wire harness clamp bracket to the No. 2 engine mounting stay RH with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

(c) Connect the wire harness clamp to the wire harness clamp bracket with the bolt.

Torque:

10 N·m {102 kgf·cm, 7 ft·lbf}

6. INSTALL ENGINE ASSEMBLY WITH TRANSAXLE

Click here

READ NEXT:

 Water Pump

 Components

COMPONENTS ILLUSTRATION *1 ENGINE WATER PUMP ASSEMBLY *2 NO. 2 IDLER PULLEY SUB-ASSEMBLY *3 WATER PUMP PULLEY *4 WATER PUMP GASKET *5 V-RIBBED BELT - - N*m (kgf*cm

 On-vehicle Inspection

ON-VEHICLE INSPECTION CAUTION / NOTICE / HINT HINT: Water Pump Construction Evaporation Port and Drain Plug: *1 Evaporation Port *2 Mechanical Seal *3 Fluid Catch Pocket *4 Drai

SEE MORE:

 Installation

INSTALLATION CAUTION / NOTICE / HINT HINT: Use the same procedure for the RH side and LH side. The following procedure is for the LH side. PROCEDURE 1. INSTALL OUTER REAR VIEW MIRROR ASSEMBLY (a) Engage the 2 guides and claw. (b) Install the outer rear view mirror assembly with the 3 nuts. T

 Removal

REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed and installed, or replaced during front drive shaft assembly removal/installation are shown below. Necessary Procedures After Parts Remov

© 2016-2024 Copyright www.lexguide.net