Lexus ES: Inspection
INSPECTION
PROCEDURE
1. INSPECT FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection | Condition | Specified Condition |
1 - 2 | 20°C (68°F) | 22 to 28 Ω |
If the result is not as specified, replace the flow shutting valve (water by-pass hose assembly).
READ NEXT:
INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) (a) Connect the flow shutting valve (water by-pass hose assembly) to the transmission oil cooler and slide the clip
COMPONENTS ILLUSTRATION *1 FRONT WHEEL OPENING EXTENSION PAD LH *2 FRONT WHEEL OPENING EXTENSION PAD RH *3 NO. 1 ENGINE UNDER COVER *4 NO. 2 ENGINE UNDER COVER ASSEMBLY N*m
SEE MORE:
PARTS LOCATION ILLUSTRATION *A for Manual Tilt and Manual Telescopic Steering Column *B for Power Tilt and Power Telescopic Steering Column *C w/ Power Trunk Lid System - - *1 MULTIPLEX NETWORK MASTER SWITCH ASSEMBLY *2 INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - ECU-B N
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during mass air flow meter sub-assembly removal/installation are shown below. Necessary Procedures After Parts
© 2016-2024 Copyright www.lexguide.net