Lexus ES: Diagnosis System
DIAGNOSIS SYSTEM
CHECK DLC3
(a) Check the DLC3.
Click here
INSPECT AUXILIARY BATTERY VOLTAGE
(a) Measure the auxiliary battery voltage with the power switch off.
Standard Voltage:
11 to 14 V
If the voltage is below 11 V, recharge or replace the auxiliary battery.
READ NEXT:
DATA LIST / ACTIVE TEST ACTIVE TEST HINT: Using the Techstream to perform Active Tests allows relays, VSVs, actuators and other items to be operated without removing any parts. This non-intrusive func
DESCRIPTION When the rear window defogger switch on the air conditioning control assembly is pressed, the operation signal is transmitted to the air conditioning amplifier assembly via LIN communicati
On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. CHECK REAR WINDOW DEFOGGER OPERATION (a) When the engine switch (for Gasoline Model) or power switch (for HV Model) is on (IG) and the rear win
SEE MORE:
DESCRIPTION The headlight ECU sub-assembly operates using the power source voltage input from the IG terminal and ECUB terminal. The power source voltage of the ECUB terminal is supplied when the main body ECU (multiplex network body ECU) turns the ECUB power supply relay (H-LP LH relay and H-LP RH
INSTALLATION PROCEDURE 1. INSTALL THROTTLE BODY GASKET (a) Install a new throttle body gasket to the intake air surge tank assembly with the protrusion of the throttle body gasket oriented as shown in the illustration. *a Protrusion 2. INSTALL THROTTLE BODY WITH MOTOR ASSE
© 2016-2026 Copyright www.lexguide.net
