Lexus ES: Components
COMPONENTS
ILLUSTRATION
| *1 | CAM TIMING OIL CONTROL SOLENOID ASSEMBLY | *2 | NO. 1 ENGINE COVER SUB-ASSEMBLY |
| *3 | O-RING | - | - |
| N*m (kgf*cm, ft.*lbf): Specified torque | ● | Non-reusable part |
| ★ | Precoated part | - | - |
READ NEXT:
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (a) Connect the Techstream to the DLC3. (b) Turn the power switch on (IG). (c) Turn the Techstream on. (d) Put the e
REMOVAL CAUTION / NOTICE / HINT NOTICE: This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here PROCEDURE
INSPECTION PROCEDURE 1. INSPECT CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (a) Check the resistance. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance:
SEE MORE:
REASSEMBLY PROCEDURE 1. INSTALL WATER INLET PIPE (a) Install the water inlet pipe with the 2 bolts. Torque: 10 N·m {102 kgf·cm, 7 ft·lbf} 2. INSTALL NO. 2 CYLINDER HEAD GASKET Click here 3. INSTALL CYLINDER HEAD LH (a) Place the cylinder head LH onto the cylinder block sub-asse
DESCRIPTION Based on signals from the transmission revolution sensors (NT and NC), the actual gear is detected. The ECM compares the actual gear with the shift schedule in the ECM memory to detect mechanical malfunctions of the solenoid valves, transmission valve body assembly and automatic transaxl
© 2016-2026 Copyright www.lexguide.net
