Lexus ES: Oil Cooler
READ NEXT:
COMPONENTS ILLUSTRATION *A Type A *B Type B *1 FRONT FENDER APRON SEAL LH *2 FRONT WHEEL OPENING EXTENSION PAD LH *3 FRONT WHEEL OPENING EXTENSION PAD RH *4 NO. 1 ENGINE
INSTALLATION PROCEDURE 1. INSTALL TRANSMISSION OIL COOLER (a) Temporarily install the transmission oil cooler to the automatic transaxle case sub-assembly with the bolt (A). (b) Install
REMOVAL CAUTION / NOTICE / HINT The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during tran
SEE MORE:
INSTALLATION PROCEDURE 1. INSTALL TURN SIGNAL SWITCH (a) Engage the claw as shown in the illustration. Install in this Direction (b) Install the turn signal switch with the 2 screws. 2. INSTALL UPPER STEERING COLUMN COVER Click here 3. INSTALL LOWER STEERING COLUMN COVER SUB-ASSEMBLY Cli
REASSEMBLY PROCEDURE 1. INSTALL FRONT BUMPER SIDE SUPPORT LH (a) Engage the clip as shown in the illustration. Install in this Direction (b) Install the front bumper side support LH with the bolt. Torque: 5.4 N·m {55 kgf·cm, 48 in·lbf} 2. INSTALL FRONT BUMPER SIDE SUPPOR
© 2016-2026 Copyright www.lexguide.net
