INSTALLATION
PROCEDURE
1. INSTALL SUSPENSION TOWER DAMPER
(a) Install the suspension tower damper to the front bumper extension sub-assembly LH and front bumper extension sub-assembly RH with the 4 bolts.
Torque:
27.5 N·m {280 kgf·cm, 20 ft·lbf}
NOTICE:
Do not extend or compress the damper.
2. INSTALL NO. 1 ENGINE UNDER COVER
for A25A-FKS: Click here
for A25A-FXS: Click here
for 2GR-FKS: Click here
3. INSTALL FRONT WHEEL OPENING EXTENSION PAD LH
for A25A-FKS: Click here
for A25A-FXS: Click here
for 2GR-FKS: Click here
4. INSTALL FRONT WHEEL OPENING EXTENSION PAD RH
for A25A-FKS: Click here
for A25A-FXS: Click here
for 2GR-FKS: Click here
Disposal
Electric Parking Brake Switch Signal Compare Failure (C060962)
GNSS Antenna Circuit Short to Ground (B15C111,B15C113)