Lexus ES manuals

Lexus ES: Installation

INSTALLATION

PROCEDURE

1. INSTALL MASS AIR FLOW METER SUB-ASSEMBLY

HINT:

Perform "Inspection After Repair" after replacing the mass air flow meter sub-assembly.

Click here

(a) Install the mass air flow meter sub-assembly to the air cleaner cap sub-assembly with the 2 screws.

NOTICE:

  • If the mass air flow meter sub-assembly has been struck or dropped, replace it.
  • If reusing the mass air flow meter sub-assembly, be sure to inspect the O-ring.
  • Make sure that the O-ring is not cracked or moved out of place when installing the mass air flow meter sub-assembly.

(b) Connect the mass air flow meter sub-assembly connector.

2. PERFORM INITIALIZATION

(a) Perform "Inspection After Repair" after replacing the mass air flow meter sub-assembly.

Click here

READ NEXT:

 Relay

On-vehicle InspectionON-VEHICLE INSPECTION PROCEDURE 1. INSPECT MAIN RELAY (EFI-MAIN NO. 1) (a) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester

 Sfi System

 Precaution

PRECAUTION INITIALIZATION NOTICE: Before replacing the ECM, refer to Registration. Click here Perform Registration (VIN registration) after replacing the ECM. Click here Perform Learning

SEE MORE:

 Terminals Of Ecu

TERMINALS OF ECU CHECK LUGGAGE CLOSER MOTOR ASSEMBLY (a) Disconnect the R7 luggage closer motor assembly connector. (b) Measure the voltage and resistance according to the value(s) in the table below. Terminal No. (Symbol) Wiring Color Terminal Description Condition Specified Condition

 AVC-LAN Circuit

DESCRIPTION Each unit of the audio and visual system connected to the AVC-LAN (communication bus) transmits signals via AVC-LAN communication. If a short to +B or short to ground occurs in an AVC-LAN communication line, the audio and visual system will not function normally because communication is

© 2016-2024 Copyright www.lexguide.net