Lexus ES manuals

Lexus ES: Dtc Check / Clear

DTC CHECK / CLEAR

CHECK DTC

(a) Connect the Techstream to the DLC3.

(b) Turn the power switch on (IG).

(c) Turn the blind spot monitor system on.

(d) Turn the Techstream on.

(e) Enter the following menus: Body Electrical / Blind Spot Monitor Master or Blind Spot Monitor Slave / Trouble Codes.

HINT:

The blind spot monitor sensor RH and the blind spot monitor sensor LH both output DTCs. Therefore, check both blind spot monitor sensors for DTCs.

Body Electrical > Blind Spot Monitor Master > Trouble Codes Body Electrical > Blind Spot Monitor Slave > Trouble Codes

(f) Check for DTCs.

Click here

CLEAR DTC

(a) Connect the Techstream to the DLC3.

(b) Turn the power switch on (IG).

(c) Turn the blind spot monitor system on.

(d) Turn the Techstream on.

(e) Enter the following menus: Body Electrical / Blind Spot Monitor Master or Blind Spot Monitor Slave / Trouble Codes.

Body Electrical > Blind Spot Monitor Master > Clear DTCs Body Electrical > Blind Spot Monitor Slave > Clear DTCs

(f) Clear the DTCs.

READ NEXT:

 Freeze Frame Data

FREEZE FRAME DATA FREEZE FRAME DATA (a) Whenever DTCs are detected, the blind spot monitor sensor stores the current vehicle (sensor) state as freeze frame data. CHECK FREEZE FRAME DATA (a) Connect th

 How To Proceed With Troubleshooting

CAUTION / NOTICE / HINT HINT: Use the following procedure to troubleshoot the blind spot monitor system. *: Use the Techstream. PROCEDURE 1. VEHICLE BROUGHT TO WORKSHOP NEXT

 Parts Location

PARTS LOCATION ILLUSTRATION *1 OUTER REAR VIEW MIRROR ASSEMBLY RH *2 OUTER REAR VIEW MIRROR ASSEMBLY LH *3 BRAKE BOOSTER WITH MASTER CYLINDER ASSEMBLY - SKID CONTROL ECU *4 HYBRID

SEE MORE:

 Installation

INSTALLATION PROCEDURE 1. INSTALL FLOW SHUTTING VALVE (WATER BY-PASS HOSE ASSEMBLY) (a) Connect the flow shutting valve (water by-pass hose assembly) to the transmission oil cooler and slide the clip to secure it. *a 2 to 7 mm (0.0787 to 0.276 in.) *b Paint Mark *c 45° (Tabs of Clip

 Reassembly

REASSEMBLY PROCEDURE 1. INSTALL NO. 2 RADIATOR GRILLE SEAL HINT: When installing the No. 2 radiator grille seal, heat the radiator shutter using a heat light. Heating Temperature Item Temperature Radiator Shutter 20 to 30°C (68 to 86°F) CAUTION: Do not touch the heat light and hea

© 2016-2026 Copyright www.lexguide.net