Lexus ES: Operation Check
OPERATION CHECK
CHECK WINDSHIELD DEICER SYSTEM
(a) Turn the power switch on (IG).
(b) Check that the windshield deicer wire (windshield glass) becomes warm by operating the front wiper deicer switch.
(c) Confirm that windshield deicer system operation stops after approximately 15 minutes.
NOTICE:
If the auxiliary battery voltage becomes low, auxiliary battery load control will operate in order to ensure sufficient power is supplied to the power steering system. In this case, the windshield deicer system may not operate.
READ NEXT:
PROBLEM SYMPTOMS TABLE NOTICE:
If the auxiliary battery voltage becomes low, auxiliary battery load control will operate in order to ensure sufficient power is supplied to the power steering system
TERMINALS OF ECU CHECK AIR CONDITIONING AMPLIFIER ASSEMBLY *A w/o Seat Heater *B w/ Seat Heater (a) Disconnect the G39 air conditioning amplifier assembly connector. (b) Measure the volta
DIAGNOSIS SYSTEM CHECK DLC3 (a) Check the DLC3. Click here INSPECT AUXILIARY BATTERY VOLTAGE (a) Measure the auxiliary battery voltage with the power switch off. Standard Voltage: 11 to 14 V If the
SEE MORE:
COMPONENTS ILLUSTRATION *1 REAR FLOOR SIDE MEMBER COVER - - N*m (kgf*cm, ft.*lbf): Specified torque - - ILLUSTRATION *1 CANISTER (CHARCOAL CANISTER ASSEMBLY) *2 LEAK DETECTION PUMP SUB-ASSEMBLY *3 NO. 2 CHARCOAL CANISTER SUB-ASSEMBLY *4 CLIP *5 FUEL
DESCRIPTION C13A1 is stored if the power supply relay in the parking brake ECU assembly has a short circuit. C13A1 is stored if the power switch is off and a voltage of 2.5 V or higher is applied to the IG terminal and an electric parking brake switch assembly malfunction or wire harness malfunction
© 2016-2026 Copyright www.lexguide.net
