Lexus ES manuals

Lexus ES: On-vehicle Inspection

ON-VEHICLE INSPECTION

PROCEDURE

1. INSPECT CAM TIMING OIL CONTROL SOLENOID ASSEMBLY

(a) Connect the Techstream to the DLC3.

(b) Start the engine.

(c) Turn the Techstream on.

(d) Enter the following menus: Powertrain / Engine / Active Test / Control the Exhaust VVT OCV Duty Ratio Bank 1.

Powertrain > Engine > Active Test

Tester Display

Control the Exhaust VVT OCV Duty Ratio Bank 1

(e) According to the display on the Techstream, perform the Active Test and check the engine speed while operating the cam timing oil control solenoid assembly.

Standard Condition:

Techstream Operation

Engine Condition

0%

Normal engine speed

100%

Engine idles roughly or stalls

HINT:

Refer to "Data List / Active Test" [Exhaust VVT Hold Learn Value Bank 1, Exhaust VVT Change Angle Bank 1, Exhaust VVT OCV Control Duty Ratio Bank 1 and Exhaust VVT Target Angle Bank 1].

Click here

If the result is not as specified, check the cam timing oil control solenoid assembly, wire harness and ECM.

READ NEXT:

 Removal

REMOVAL CAUTION / NOTICE / HINT NOTICE: This procedure includes the removal of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here PROCEDURE

 Inspection

INSPECTION PROCEDURE 1. INSPECT CAM TIMING OIL CONTROL SOLENOID ASSEMBLY (a) Check the resistance. (1) Measure the resistance according to the value(s) in the table below. Standard Resistance:

 Installation

INSTALLATION CAUTION / NOTICE / HINT NOTICE: This procedure includes the installation of small-head bolts. Refer to Small-Head Bolts of Basic Repair Hint to identify the small-head bolts. Click here

SEE MORE:

 Inspection

INSPECTION PROCEDURE 1. INSPECT NO. 1 HV BATTERY INTAKE FILTER HINT: If the vehicle is used in an area with heavy traffic or excessive dust, or if the rear seat is used frequently, the No. 1 HV battery intake filter may be clogged. Clean or replace the No. 1 HV battery intake fil

 Parts Location

PARTS LOCATION ILLUSTRATION *1 HYBRID VEHICLE CONTROL ECU *2 INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - ECU-B NO. 1 FUSE *3 NO. 4 RELAY BLOCK - IGCT NO. 2 FUSE - PM-IGCT FUSE - BATT FAN FUSE *4 DLC3 *5 NO. 3 RELAY BLOCK - IGCT RELAY - - ILLUSTRATION *1 HV BATTE

© 2016-2026 Copyright www.lexguide.net