Lexus ES: Garage Door Opener
READ NEXT:
ON-VEHICLE INSPECTION PROCEDURE 1. INSPECT GARAGE DOOR OPENER (a) Press each garage door opener ("HomeLink") switch and check that the ("HomeLink") indicator light turns on. If one or more of the g
PARTS LOCATION ILLUSTRATION *1 INNER REAR VIEW MIRROR ASSEMBLY - GARAGE DOOR OPENER *2 INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY - ECU-B NO. 2 FUSE - ECU-IG1 NO. 3 FUSE *3 MAP LIGHT ASS
SEE MORE:
DESCRIPTION Refer to DTC P019011. Click here DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory Note P019015 Fuel Rail Pressure Sensor "A" Circuit Short to Battery or Open The fuel pressure sensor (for high pressure side) output voltage is higher than 4.9
INSPECTION PROCEDURE 1. INSPECT SHIFT PADDLE SWITCH (TRANSMISSION SHIFT SWITCH ASSEMBLY) (a) Shift Paddle Switch LH (Transmission Shift Switch Assembly): (1) Measure the resistance according to the value(s) in the table below. Standard Resistance: Tester Connection Condition Specified Con
© 2016-2023 Copyright www.lexguide.net
